PRE-ASSESSMENT IN-LINE INSPECTION SUPPORT
In-line inspection (ILI) success begins with proper planning. And proper planning requires practical experience, knowledge, and knowhow gained from years of experience running smart tools.
Our pipeline integrity professionals perform due diligence to justify an operator’s decisions for selection of the right assessment method (ILI or something else), the right ILI tool technology, and the right ILI tool run interval. In addition, we offer comprehensive, customized ILI procedures that help to ensure first-run success, maintain health and safety standards, and ensure the delivery of high-quality inspection data.
ILI Specification and Reporting
- ILI process procedures
- ILI data standards
Pipeline Information Gathering and Analysis
- Review critical pipe design records
- Assess M[A]OP records for their traceable, verifiable, and complete (TVC) status
- Review and assist with your Integrity Verification Process (IVP)
Tool Selection Based on Threat Screening
- API 1160 tool selection matrix (Part 195)
- ASME B31.8S tool selection considerations (Part 192)
Pre-Assessment Planning
Vendor Procurement Assistance
- Pipeline ILI questionnaire
- Bid specification sheet
- Request for information and proposal
- Vendor personnel qualifications (ANSI/ASNT ILI-PQ and API 1163)
- Vendor selection and bid award